Permits and permissions for a pool
Building a pool requires a permit or permission. You can follow the process yourself or we can handle it — but either way it has to be settled before excavation.
Building a pool requires a permit or permission. You can follow the process yourself or we can handle it — but either way it has to be settled before excavation.
Not every loss is a leak. Rule out evaporation first, then locate the leak — because re-lining without finding it hides the problem rather than solving it.
Heating is measured not by the price of the unit but by the volume of water to be heated. And the cheapest way to extend the season is usually a cover, not a heater.
Both routes are valid, but one needs attention and the other discipline. The wrong route is the third one: doing nothing.
Going green is not a cause but a result. Behind it is usually one of four things: pH balance, filtration hours, dead zones, or an external load.
Both make a good pool; the choice depends on your garden, your dimensions and site access. Five points to weigh before deciding.
Pool cost comes down to volume, shape, ground, lining and equipment. The six points to settle before asking for a quote — and the item nobody asks about: running cost.
Let's talk about your project.
We use cookies that are strictly necessary for the site to work. You may also allow analytics cookies that measure visit statistics — these do not run without your consent. Cookie Policy